Tuesday 28 May 2013

Ready to roll??

Wheels on
Clutch and brake master cylinders overhauled
Servo removed and bypass pipe fitted (deliberate policy)
Heater box de-rusted and painted
Engine bay readied for re-installation

Problems with the valve guides in the cylinder head mean that more work is required. The head should be back at Lakeside later this week ready for the engine to be reassembled and then installed. 

The engine will be fired up as a test and the car will then go for bodywork repairs and respray. Two quotes so far, should get a third next week. Eye-watering numbers...............

No comments:

Post a Comment